A practical checklist
- Check with the person doing the job before recording it as completed.
- For a partial job, describe the completed area and the work that remains.
- Keep future plans in your chosen planning system; return to the journal after execution.
A planned irrigation run was canceled because the line needed repair. No Irrigation activity is added for the planned run. A note on the actual inspection explains the fault without claiming water was applied.
What to avoid
My Farm Assistant activities use actual dates and do not accept future work dates. Do not use a past date to force a future plan into the history.