A practical checklist
- Choose Irrigation and describe the block or section served.
- Enter litres or gallons only if the applied volume is known.
- Put runtime and the source of any estimate in notes when volume was not measured.
Irrigation · Vegetable East · July 8. Notes: “North block ran 06:00–08:30; meter unavailable, volume not recorded.” The entry preserves useful timing without pretending two and a half hours is a water quantity.
What to avoid
Do not infer volume from runtime without a verified flow basis. The app does not calculate applied depth from time or field area.