A practical checklist

  1. Choose Irrigation and describe the block or section served.
  2. Enter litres or gallons only if the applied volume is known.
  3. Put runtime and the source of any estimate in notes when volume was not measured.
Illustrative recordA worked example

Irrigation · Vegetable East · July 8. Notes: “North block ran 06:00–08:30; meter unavailable, volume not recorded.” The entry preserves useful timing without pretending two and a half hours is a water quantity.

What to avoid

Do not infer volume from runtime without a verified flow basis. The app does not calculate applied depth from time or field area.

All crop care guides