A practical checklist
- Label a quantity with its actual unit and the portion of the job it covers.
- Write any separately calculated rate with its full basis in notes.
- Check worked area and units before doing an external calculation or comparison.
A recorded 200 L is the measured total mixture used on a section. Notes say “Total volume, not L/ha; worked area not measured.” The journal preserves the known amount without creating a rate from incomplete data.
What to avoid
The app quantity field does not calculate or validate application rates. Never infer a rate using total field area when the operation covered only part of it.